FOLEY STRATEGIC ADVISORY
WEEKLY BRIEF · ISSUE 6 · NOVEMBER 19, 2026
The Enemy's Metal and the Fake Bolt
Two Cold War supply chain stories for Veterans Day week, and what they mean for what you buy today.
Last Wednesday was Veterans Day. To everyone who served, and to the families who served with you: thank you.
I spent my Air Force career in supply chain and logistics, and I learned early that wars are won or lost on parts. This week I want to share two Cold War stories that still shape how I think about every purchase. One is about a metal the United States bought from its adversary. The other is about a bolt nobody checked.
1. Buying From the Enemy
In the early 1960s, Lockheed built the A-12, the spy plane that led to the SR-71 Blackbird, to fly faster and higher than anything the Soviet Union could shoot down. More than 90 percent of its airframe was titanium alloy. At first, 95 percent of the alloy Lockheed's supplier delivered was rejected for quality.1
Then came the harder problem. The metal was so scarce that, in the Central Intelligence Agency's own history, "some had to be obtained covertly from the country with the largest known reserves": the Soviet Union.1 The plane built to watch the Soviet Union was made from Soviet metal.
The same problem today is rare earth magnets. China supplied 71 percent of United States imports of rare earth compounds and metals from 2021 through 2024, and the country relied on imports for an estimated 67 percent of what it used in 2025.2 Magnets are the biggest use worldwide. From January 1, 2027, defense contractors may not deliver covered magnets, tantalum or tungsten that were mined, refined, separated, melted or produced in China, Russia, North Korea or Iran, and the rule flows down to subcontracts.3
The lesson: know which of your critical inputs trace back to a country you can't count on, and price the second source while you still have time to build it.
2. The Bolt Nobody Checked
In the late 1980s, a House investigation found counterfeit and substandard high-strength bolts throughout the defense supply system. The Defense Industrial Supply Center reportedly found more than 30 million counterfeit fasteners in its inventory, and Army depots held 2.6 million more. The Air Force found substandard fasteners in its flight-safety-critical stock. The National Aeronautics and Space Administration found them in space shuttle equipment.4
Nuclear plants had them too. Regulators tested 32 fasteners from three plants and 11 failed. Two bolts marked as high strength held about 55,000 pounds per square inch, against 125,000 required.5
Congress passed the Fastener Quality Act on November 16, 1990. It required lot testing by accredited labs, a certificate that travels with each lot, grade markings and registered maker marks, and records kept for 10 years.6 Working rules did not take effect until 1998, and a 1999 amendment exempted parts made under certified quality systems.7
It still happens. In July 2024, a man was sentenced to 3.5 years in prison for selling the Defense Logistics Agency more than $3.5 million of counterfeit or misrepresented fan assemblies, some meant for a nuclear submarine and a surface-to-air missile system.8
The lesson: the part that fails is rarely the one you negotiated hardest. It is the cheap commodity part, two or three tiers down, with a paper trail nobody reads.
This Week in Supply Chain and Federal Contracting
- Lead times are still stretching. Supplier deliveries slowed again in October, and longer lead times came up in 41 percent of buyers' negative comments. Average lead time was 87 days for production materials, 46 days for maintenance and repair supplies and 175 days for capital equipment.9
- Factory backlogs grew. New orders for manufactured goods rose 1.8 percent in September to $677.2 billion. Unfilled orders rose 0.9 percent to $1,623.8 billion. A growing backlog upstream means longer queues for you.10
- Federal funding runs out December 11. The stopgap signed September 2 funds the government through December 11, 2026.11 If you hold federal work, know which awards and option periods land after that date.
- Defense cybersecurity certification is on hold. Phase 2 of the Cybersecurity Maturity Model Certification, which would have required third-party assessments starting November 10, 2026, was suspended on July 13. Phase 1 self-assessments remain in force.12
- Industrial machinery is under trade review. An October 28 proclamation under the national security trade law covers robotics, industrial machinery and their parts. It directs negotiations with trading partners and leaves further import action open.13 If you buy spare parts for imported equipment, watch this one.
What I'd Do This Week
- Trace origin: list your 10 most critical inputs and trace each one to where the material was mined or melted, not where the part shipped from.
- Magnets and metals: if you sell into defense, ask your suppliers now for origin back to the mine on magnets, tantalum and tungsten. January 1 is six weeks away.
- Pull one cert: pick three commodity parts on safety-critical equipment, such as bolts, fittings or gaskets. Pull the certificate for the last lot received and check that the lot number matches the box.
- Ask your distributor: get it in writing that every lot ships with the maker's own certificate and lot number, and that the parts were bought from the maker or its authorized channel, not the open market. A distributor that won't put that in writing has given you your answer.
- Federal calendar: if you hold federal contracts, write down what you would do if funding lapses after December 11, and keep your cybersecurity self-assessment current.
The Bottom Line
Both stories come down to the same blind spot: the part you can't see. One was hidden by geography, the other by paperwork. The people who serve depend on buyers who look past the first tier.
Which of your critical parts could you not trace back to the mine or the lot? Reply and tell me. It comes straight to me.
If this issue turns up a part, a supplier or a category you cannot afford to get wrong, that is what a 30-minute call is for. Book a 30-minute call.
John Foley
Founder, Foley Strategic Advisory
Want the next Brief in your inbox? Subscribe on the Weekly Brief page to get every Monday issue.
Subscribe to the Weekly BriefSources
- David Robarge, "Archangel: CIA's Supersonic A-12 Reconnaissance Aircraft," 2nd edition, Central Intelligence Agency, Center for the Study of Intelligence, January 2012, "Finding the Right Metal." cia.gov (opens in a new tab)
- U.S. Geological Survey, "Mineral Commodity Summaries 2026: Rare Earths," February 2026. usgs.gov (opens in a new tab)
- Defense Federal Acquisition Regulation Supplement 252.225-7052, "Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten" (May 2024). acquisition.gov (opens in a new tab)
- General Accounting Office, "Quality Assurance: The Fastener Quality Act's Small-Lot Exemption," GAO-01-719, June 8, 2001, citing the 1988 House Energy and Commerce Subcommittee on Oversight and Investigations report. govinfo.gov (opens in a new tab)
- Nuclear Regulatory Commission, Bulletin 87-02, "Fastener Testing to Determine Conformance with Applicable Material Specifications," November 6, 1987. nrc.gov (opens in a new tab)
- Fastener Quality Act, Public Law 101-592, November 16, 1990. house.gov (opens in a new tab)
- House Report 106-121, April 29, 1999; Public Law 106-34, June 8, 1999. govinfo.gov (opens in a new tab)
- U.S. Department of Justice, "Man Sentenced for Selling $3.5M in Counterfeit and Substandard Electronics for Use in Military Systems," July 18, 2024. justice.gov (opens in a new tab)
- Institute for Supply Management, "Manufacturing PMI at 55.5%; October 2026 ISM Manufacturing PMI Report," November 2, 2026. ISM release (opens in a new tab)
- U.S. Census Bureau, "Manufacturers' Shipments, Inventories, and Orders," September 2026, released November 3, 2026. census.gov (opens in a new tab)
- The White House, statement on H.R. 6500, the Continuing Appropriations and Extensions Act, 2027, September 2, 2026. whitehouse.gov (opens in a new tab)
- Department of War Chief Information Officer, "About CMMC," suspension of Phase II announced July 13, 2026, checked November 6, 2026. defense.gov (opens in a new tab)
- The White House, fact sheet on adjusting imports of robotics, industrial machinery and their parts and components, October 28, 2026. whitehouse.gov (opens in a new tab)